Standard
UPDATE AVAILABLE
Track updates
AS 2439.1-2007
[Current]Perforated plastics drainage and effluent pipe and fittings, Part 1: Perforated drainage pipe and associated fittings
Specifies requirements for perforated plastics pipe and associated fittings designed for use in the drainage of surface and subsurface land, highway and building construction sites.
Published: 24/12/2007
Pages: 25
Table of contents
Cited references
Content history
Table of contents
Header
About this publication
Preface
1 Scope and general
1.1 Scope
1.2 Application
1.3 Referenced documents
1.4 Definitions
1.5 Types
1.6 Classification
2 General requirements
2.1 General
2.2 Material
2.3 Freedom from defects
2.3.1 General
2.3.2 Spigot ends
2.4 Dimensions
2.4.1 Diameter
2.4.2 Length
3 Perforations
3.1 Type 1 pipe
3.2 Type 2 pipe
3.3 Fittings
4 Storage and transport
5 Performance requirements
5.1 Conditioning of test specimens
5.2 Bending (Type 1 pipe only)
5.3 Straightening (Type 1 pipe only)
5.4 High temperature impact resistance
5.5 Low temperature impact resistance
5.6 Elongation (Type 1 pipe only).
5.7 Pipe stiffness
5.8 Perforation deformation
5.8.1 Type 1 pipe
5.8.2 Type 2 pipe
5.9 Joint separation (Type 1 only)
5.10 Environmental stress cracking resistance (Polyethylene drainage pipe only)
5.11 Marking
5.11.1 Type 1 pipe
5.11.2 Type 2 pipe
Appendix A
A1 Scope
A2 Relevance
A3 Definitions
A4 ‘Text deleted’
A5 Minimum sampling and testing frequency plan
A5.1 General
A5.2 Testing
A5.3 Retesting
A5.4 Rejection after test
A6 New formulation
Appendix B
B1 Scope
B2 Apparatus
B3 Preparation of test specimens
B3.1 Diameter—Outside and inside
B3.2 Length
B3.3 Perforations
B4 Test procedures
B5 Report
B5.1 Outside diameter
B5.2 Inside diameter
B5.3 Length
B5.4 Perforations
B5.4.1 Opening area
B5.4.2 Slot width
Appendix C
C1 Scope
C2 Principle
C3 Apparatus
C4 Preparation of test specimens
C5 Test procedure
C6 Report
Appendix D
D1 Scope
D2 Principle
D3 Apparatus
D4 Preparation of test specimens
D5 Test procedure
D6 Report
Appendix E
E1 Scope
E2 Principle
E3 Apparatus
E4 Preparation of test specimens
E5 Test procedure
E6 Report
Appendix F
F1 Scope
F2 Principle
F3 Apparatus
F4 Preparation of test specimens
F5 Test procedure
F6 Report
Appendix G
G1 Scope
G2 Principle
G3 Apparatus
G4 Preparation of test specimens
G5 Test procedure
G6 Calculation
G7 Report
G7.1 Pipe elongation
G7.2 Perforation deformation
Appendix H
H1 Scope
H2 Principle
H3 Apparatus
H4 Preparation of test specimens
H5 Test procedure
H6 Calculations
H7 Report
H7.1 Pipe stiffness
H7.2 Perforation deformation (Type 2 only)
Appendix I
I1 Scope
I2 Principle
I3 Apparatus
I4 Preparation of test specimen
I5 Test procedure
I6 Report
Appendix J
J1 Scope
J2 Apparatus
J3 Reagent
J4 Test specimens
J5 Conditioning of test specimens
J6 Procedure
J7 Report
Amendment control sheet
Cited references in this standard
[Withdrawn]
Conformity assessment — Guidance on a third-party certification system for products
[Current]
Methods of test for plastics pipes and fittings, Method 22: Thermoplastics pipes — Determination of ring stiffness (ISO 9969:2016, IDT)
[Current]
General requirements for the competence of testing and calibration laboratories
One-time Purchase
Access via web browser on any device
One-time purchase
Single publication
Offline access via PDF^
$119.17 AUD
Inclusive of GSTFormat *
Web Reader
Licenses *
1 user
Total$119.17 AUD
IMPORTANT