Standard
UPDATE AVAILABLE
Track updates
AS/NZS 1839:1994
[Available Superseded]Swimming pools — Premoulded fibre-reinforced plastics — Installation
Sets out procedures for the installation of premoulded fibre-reinforced plastic swimming pools complying with the requirements of AS/NZS 1838:1994, for above and below ground locations.
Published: 14/11/1994
Pages: 9
Table of contents
Cited references
Content history
Table of contents
Header
About this publication
PREFACE
1 SCOPE
2 REFERENCED DOCUMENTS
3 STORAGE, HANDLING AND TRANSPORT OF POOLS
4 INSTALLATION CRITERIA
4.1 Condition of the pool at the point of delivery
4.2 Imposed loads
4.3 Bottom load
4.4 Movement of sub-surface water
5 MATERIALS
5.1 Bedding
5.2 Backfill
6 EXCAVATION FOR POOLS IN THE GROUND
6.1 Support during excavation
6.1.1 Permanent support
6.1.2 Temporary support
6.1.3 Easements
6.2 Excavation profile
7 INSTALLATION OF POOLS IN THE GROUND
7.1 Deflection limits
7.1.1 Overall variation
7.1.2 Deviations from pool shape (internal surface)
7.2 Pool drainage
7.2.1 Height of coping
7.2.2 Drainage around pools
7.2.3 Fully piped subsoil drainage
7.2.4 Bedding
7.2.5 Hydrostatic valve
7.2.6 Standpipe
7.3 Site work
7.4 Placement and backfilling of pool
7.5 Final level of pool
7.6 Concrete bond beam
8 INSTALLATION OF POOLS ABOVE THE GROUND
8.1 General
8.2 Base preparation
8.3 Bedding
8.4 Final level of pool
9 POOL-ASSOCIATED SERVICES
9.1 Electrical connections
9.2 Plumbing
9.3 Skimmer boxes
9.4 Fencing (for New Zealand application only)
10 OPERATING INSTRUCTIONS
Cited references in this standard
NZS 5826.1
Code of Practice for Operation of Swimming Pools, Part 1: Control of Pool Water Quality
AS 1926.2(Int)
Swimming pool safety, Part 2: Location of fencing for private swimming pools
One-time Purchase
Access via web browser on any device
One-time purchase
Single publication
Offline access via PDF^
$47.99 AUD
Inclusive of GSTFormat *
Web Reader
Licenses *
1 user
Total$47.99 AUD
IMPORTANT