Standard
Track updates
AS/NZS 1680.2.4:2017
[Current]Interior and workplace lighting, Part 2.4: Industrial tasks and processes
Sets out recommendations for the lighting of industrial tasks and processes that are carried out within buildings.
Published: 30/06/2017
Pages: 37
Table of contents
Cited references
Content history
Table of contents
Header
About this publication
Preface
1 Scope and general
1.1 Scope
1.2 Application
1.3 Referenced documents
1.4 Definitions
2 General requirements for good interior lighting
3 Task visibility
3.1 General
3.2 Factors that influence task visibility
3.2.1 General
3.2.2 Provision of contrasting backgrounds
3.2.3 Provision of luminous backgrounds
3.2.4 Use of magnifying devices
3.2.5 Elimination of distractions from surroundings
3.2.6 Production of helpful reflections for inspection of shiny surfaces
3.2.7 Revealing form, surface texture or irregularities
3.2.8 Inspection of moving parts
3.2.9 Use of special light sources
3.3 Automated plant or processes
3.4 Industrial tasks and processes
4 Directional effects of lighting
4.1 General
4.2 Adverse effects of reflections
4.3 Reflections in screen-based equipment
5 Unwanted reflections
6 Surfaces
6.1 General
6.2 Limited illuminance contribution from inter-reflection
7 Light source colour
8 Glare and related effects
9 Light sources, luminaires and control systems
9.1 General
9.2 Selection of lighting equipment
10 Lighting systems
10.1 General
10.2 Emergency evacuation lighting
10.3 Safety lighting
10.4 Standby lighting
10.5 Supplementary lighting for maintenance tasks
11 Lighting design procedure
11.1 General
11.2 Allowances in design
12 Maintenance of lighting systems and equipment
12.1 General
12.2 Provision for maintenance
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
E1 Introduction
E2 Recommendations
Cited references in this standard
[Current]
Electrical installations — Classification of the fire and mechanical performance of wiring system elements
[Available Superseded]
Spray painting booths, designated spray painting areas and paint mixing rooms, Part 1: Design, construction and testing
[Superseded]
Emergency escape lighting and exit signs for buildings, Part 1: System design, installation and operation
One-time Purchase
Access via web browser on any device
One-time purchase
Single publication
Offline access via PDF^
$141.91 AUD
Inclusive of GSTFormat *
Web Reader
Licenses *
1 user
Total$141.91 AUD
IMPORTANT