Standard
UPDATE AVAILABLE
Track updates
iconCreated with Sketch.

AS/NZS 1680.2.4:1997

[Available Superseded]

Interior lighting, Part 2.4: Industrial tasks and processes

Sets out recommendations for the lighting of industrial tasks and processes with a view to providing visual environments in which such tasks and processes may be safely and efficiently performed. It is intended to be read in conjunction with the general recommendations of AS 1680.1.
Published: 05/01/1997
Pages: 48
Table of contents
Cited references
Content history
Table of contents
Header
About this publication
PREFACE
1 SCOPE AND GENERAL
1.1 SCOPE
1.2 APPLICATION
1.3 REFERENCED DOCUMENTS
1.4 DEFINITIONS
2 GENERAL REQUIREMENTS FOR GOOD LIGHTING
3 TASK VISIBILITY
3.1 FACTORS THAT INFLUENCE TASK VISIBILITY
3.1.1 General
3.1.2 Provision of contrasting backgrounds
3.1.3 Provision of luminous backgrounds
3.1.4 Use of magnifying devices
3.1.5 Elimination of distractions from surroundings
3.1.6 Production of helpful reflections for inspection of shiny surfaces
3.1.7 Revealing form, surface texture or irregularities
3.1.8 Inspection of moving parts
3.1.9 Use of special light sources
3.2 AUTOMATED PLANT OR PROCESSES
4 DIRECTIONAL EFFECTS OF LIGHTING
4.1 ENHANCING TASK VISIBILITY
5 UNWANTED REFLECTIONS
5.1 ADVERSE EFFECTS OF REFLECTIONS
5.2 REFLECTIONS IN SCREEN-BASED EQUIPMENT
6 SURFACES
6.1 LIMITED ILLUMINANCE CONTRIBUTION FROM INTERREFLECTION
7 LIGHT SOURCE COLOUR
7.1 SUBJECTIVE INFLUENCE OF SOURCE COLOUR APPEARANCE
7.2 DIMMING OF HIGH INTENSITY DISCHARGE LAMPS
7.3 MIXING OF DIFFERENT LAMPS
7.4 TASKS WITH SPECIAL REQUIREMENTS
8 GLARE AND RELATED EFFECTS
8.1 SELECTION OF GLARE CONTROL SYSTEM
9 LIGHT SOURCES, LUMINAIRES AND CONTROL SYSTEMS
9.1 SELECTION OF LIGHTING EQUIPMENT
10 LIGHTING SYSTEMS
10.1 EMERGENCY EVACUATION LIGHTING
10.2 SAFETY LIGHTING
10.3 STANDBY LIGHTING
10.4 SUPPLEMENTARY LIGHTING FOR MAINTENANCE TASKS
11 LIGHTING DESIGN PROCEDURE
11.1 ALLOWANCES IN DESIGN
12 MAINTENANCE OF LIGHTING SYSTEMS AND EQUIPMENT
12.1 PROVISION FOR MAINTENANCE
APPENDIX A
APPENDIX B
APPENDIX C
APPENDIX D
APPENDIX E
E1 INTRODUCTION
E2 RECOMMENDATIONS
Cited references in this standard
[Current]
Emergency lighting and exit signs for buildings, Part 1: System design, installation and operation
[Superseded]
Spray painting booths, designated spray painting areas and paint mixing rooms, Part 2: Installation and maintenance
[Available Superseded]
Spray painting booths, designated spray painting areas and paint mixing rooms, Part 1: Design, construction and testing
[Current]
Electrical installations — Classification of the fire and mechanical performance of wiring system elements
[Current]
Lighting booths for visual assessment of colour and colour matching
Content history
[Available Superseded]
[Superseded]
AS/NZS 1680.2.4-1997 AMDT 1
DR 96056

One-time Purchase

Access via web browser on any device
One-time purchase
Single publication
Offline access via PDF^

$169.15 AUD

Inclusive of GST
Format *
iconCreated with Sketch.
Web Reader
Licenses *
iconCreated with Sketch.
1 user
Total$169.15 AUD
Add to Cart
IMPORTANT