Standard
Track updates
AS/NZS 1516:1994
[Current]The cement mortar lining of pipelines in situ
Specifies the requirements for the cement mortar lining of pipelines in situ, by spray application. The lined pipelines are intended for the conveyance of wastewater or water intended for human consumption.
Published: 15/08/1994
Pages: 10
Table of contents
Cited references
Content history
Table of contents
Header
About this publication
PREFACE
1 SCOPE
2 REFERENCED DOCUMENTS
3 DEFINITIONS
4 MATERIALS
4.1 Aggregates
4.2 Cement
4.3 Water
4.4 Admixtures
4.5 Cement mortar
5 PROPORTIONING OF MATERIALS
5.1 Aggregate:cement ratio
5.2 Water:cement ratio
6 MEASUREMENT AND MIXING OF MATERIALS
7 PREPARATION OF PIPELINE SURFACES
8 APPLICATION OF MORTAR
8.1 General
8.2 Spray application
8.3 Hand application
9 TYPE TESTING HAND REPAIR MORTAR
9.1 General
9.2 Adhesion to steel and cured mortar
9.3 Water:cement ratio
10 THICKNESS OF LINING
11 SURFACE QUALITY AND WORKMANSHIP
11.1 General
11.2 Defects
11.3 Repairs
12 CURING
13 APPLICATION OF SEAL COAT
14 EFFECT OF CEMENT MORTAR LINING ON WATER QUALITY
15 INSPECTION
15.1
15.2
15.3
APPENDIX A
A1 GENERAL
A2 INFORMATION TO BE SUPPLIED BY THE PURCHASER
A3 MATTERS TO BE DECIDED BY AGREEMENT
A4 INFORMATION TO BE SUPPLIED BY THE CONTRACTOR
APPENDIX B
B1 SCOPE
B2 STATISTICAL SAMPLING
B3 PRODUCT CERTIFICATION
B4 SUPPLIER’S QUALITY SYSTEM
B5 OTHER MEANS OF ASSESSMENT
Cited references in this standard
[Superseded]
Guide to AS 1199 - Sampling procedures and tables for inspection by attributes
[Current]
Metal finishing — Preparation and pretreatment of surfaces, Part 9: Pictorial surface preparation standards for painting steel surfaces
One-time Purchase
Access via web browser on any device
One-time purchase
Single publication
Offline access via PDF^
$59.99 AUD
Inclusive of GSTFormat *
Web Reader
Licenses *
1 user
Total$59.99 AUD
IMPORTANT