Standard
Track updates
iconCreated with Sketch.

AS/NZS 14763.2:2020

[Current]

Information technology — Implementation and operation of customer premises cabling, Part 2: Planning and installation (ISO/IEC 14763-2 (ED. 2.0) MOD)

Included in Key Standards supporting Generic Cabling in all premises types
This Standard adopts ISO/IEC 14763-2:2019 with modifications for Australia and New Zealand, which specify requirements for the planning, installation and operation of telecommunications cabling and cabling infrastructures including cabling, pathways, spaces and telecommunications bonds (other than that specified in AS 30129) in support of generic cabling standards and associated documents.
Published: 26/06/2020
Pages: 177
Table of contents
Cited references
Content history
Table of contents
Header
About this publication
Preface
FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
3.1 Terms and definitions
3.2 Abbreviated terms
3.3 Conventions
4 Conformance
5 Specification of installations
5.1 General
5.2 Installation specification
5.2.1 Requirements
5.2.1.1 General
5.2.1.2 Other infrastructures
5.2.1.3 Legislation, regulations and statements of compliance
5.2.1.4 Site contacts
5.2.2 Recommendations
5.3 Technical specification
5.3.1 General
5.3.1.1 Requirements
5.3.1.2 Recommendations
5.3.2 Notification of hazards
5.3.3 Security requirements
5.3.4 Performance and configuration – Requirements
5.3.5 Environmental conditions
5.3.5.1 Requirements
5.3.5.2 Recommendations
5.4 Scope of work
5.4.1 Pre-installation
5.4.1.1 Requirements
5.4.1.2 Recommendations
5.4.2 Installation
5.4.2.1 Requirements
5.4.2.2 Recommendations
5.4.3 Post-installation
5.4.3.1 Requirements
5.4.3.2 Recommendations
5.5 Quality assurance
6 Quality planning
6.1 Quality plan
6.2 Specification of cabling components
6.3 Sampling
6.3.1 Balanced cabling
6.3.1.1 General
6.3.1.2 Permanent link testing
6.3.1.3 Channel testing
6.3.1.4 Alien (exogenous) crosstalk testing
6.3.2 Optical fibre cabling
6.3.2.1 General
6.3.2.2 Permanent link testing
6.3.2.3 Channel testing
6.4 Treatment of marginal results
6.4.1 Balanced cabling
6.4.1.1 General
6.4.1.2 Requirements
6.4.2 Optical fibre cabling
6.5 Treatment of non-compliant results
6.6 Change control
7 Installation planning
7.1 General
7.2 Safety
7.2.1 General
7.2.2 Low voltage power supply cabling
7.2.3 Telecommunications cables fire performance
7.2.4 Optical fibre cabling
7.2.5 Transmission and terminal equipment
7.3 Environment
7.4 Points of electrical contact
7.5 External service provision
7.5.1 Requirements
7.5.2 Recommendations
7.6 Pathways and pathway systems
7.6.1 General
7.6.1.1 Pathway system types
7.6.1.2 Requirements
7.6.1.2.1 Pathway and pathway system selection
7.6.1.2.2 Pathway and pathway system capacity planning
7.6.1.3 Recommendations
7.6.1.3.1 Pathway and pathway system selection
7.6.1.3.2 Pathway and pathway system capacity planning
7.6.2 Inside buildings
7.6.2.1 Requirements
7.6.2.1.1 Loading and protection
7.6.2.1.2 Minimum bend radii
7.6.2.1.3 Maximum stacking height
7.6.2.1.4 Conduit
7.6.2.1.5 Pathway systems under access floors
7.6.2.1.6 Non-continuous support for cables
7.6.2.2 Recommendations
7.6.2.2.1 Pathway system co-ordination
7.6.2.2.2 Cable protection
7.6.2.2.3 Conduit
7.6.2.2.4 Pathway systems under access floors
7.6.2.2.5 Overhead pathway systems
7.6.3 Outside buildings
7.6.3.1 General
7.6.3.2 Requirements
7.6.3.2.1 Pathway planning
7.6.3.2.2 Underground pathways
7.6.3.2.3 Direct burial
7.6.3.2.4 Conduit
7.6.3.2.5 Aerial pathways
7.6.3.2.6 Aerial pathway systems dedicated to telecommunications cabling
7.6.3.2.7 Aerial pathway systems shared with overhead power supply infrastructures
7.6.3.2.8 Minimum bend radii
7.6.3.3 Recommendations
7.6.3.3.1 General
7.6.3.3.2 Underground pathways
7.6.3.3.3 Direct burial
7.6.3.3.4 Conduit
7.6.3.3.5 Aerial pathways
7.6.3.3.6 Aerial pathway systems dedicated to telecommunications cabling
7.7 Spaces
7.7.1 Requirements
7.7.1.1 Spaces and structures inside buildings
7.7.1.1.1 General
7.7.1.1.2 Entrance facilities
7.7.1.1.3 Equipment rooms
7.7.1.1.4 Rooms intended to contain distributors
7.7.1.1.5 Enclosures containing distributors
7.7.1.1.6 Access floors
7.7.1.2 Spaces and structures outside buildings
7.7.1.2.1 General
7.7.1.2.2 Maintenance holes
7.7.1.2.3 Hand holes
7.7.1.2.4 Telecommunications cabinets
7.7.2 Recommendations
7.7.2.1 Spaces and structures inside buildings
7.7.2.1.1 General
7.7.2.1.2 Entrance facilities
7.7.2.1.3 Equipment rooms
7.7.2.1.4 Rooms intended to contain distributors
7.7.2.1.5 Access floors
7.7.2.2 Spaces and structures outside buildings
7.8 Functional elements
7.8.1 Requirements
7.8.1.1 General
7.8.1.2 Termination points
7.8.1.3 Distributors within rooms
7.8.1.4 Cabinets, frames and racks
7.8.1.4.1 General
7.8.1.4.2 Cabinets, frames and racks containing distributors only
7.8.1.4.3 Cabinets, frames and racks containing, or intended to contain, active equipment
7.8.1.5 Closures
7.8.2 Recommendations
7.8.2.1 Distributors within rooms
7.8.2.2 Distributors within enclosures
7.8.2.3 Cabinets, frames and racks
7.9 Segregation of telecommunications cabling and power supply cabling inside buildings
7.9.1 General
7.9.2 Requirements
7.9.2.1 General requirements
7.9.2.2 Conditions for zero segregation
7.9.3 Recommendations
7.10 Segregation of underground telecommunications cabling and power supply cabling outside buildings
7.10.1 General
7.10.2 Power supply cabling ≤ AC 1 000 V RMS or DC 1 500 V
7.10.2.1 Requirements (protection)
7.10.2.2 Recommendations (protection)
7.10.2.3 Requirements (EMI)
7.10.2.4 Recommendations (EMI)
7.10.3 Power supply cabling > AC 1 000 V RMS or DC 1 500 V
7.10.3.1 Requirements (protection)
7.10.3.2 Recommendations (protection)
7.10.3.3 Requirements (EMI)
7.10.3.4 Recommendations (EMI)
7.10.4 Earthing systems
7.10.4.1 General
7.10.4.2 Requirements (protection)
7.10.4.3 Recommendations (protection)
7.10.5 Other infrastructures
7.10.5.1 Recommendations
7.11 Segregation of aerial telecommunications cabling
7.11.1 General
7.11.2 Overhead power supply infrastructures
7.11.2.1 Requirements (protection)
7.11.2.2 Recommendations (protection)
7.11.2.3 Requirements (EMI)
7.11.2.4 Recommendations (EMI)
7.11.3 Sharing of infrastructures carrying ≤ 1 000 V AC (1 500 V DC)
7.11.3.1 Requirements (protection)
7.11.3.2 Recommendations (protection)
7.11.3.3 Requirements (EMI)
7.11.3.4 Recommendations (EMI)
7.11.4 Sharing of infrastructures carrying > 1 000 V AC (1 500 V DC)
7.11.4.1 Requirements (protection) of infrastructures
7.11.4.2 Recommendations (protection)
7.11.4.3 Requirements (EMI)
7.11.4.4 Recommendations (EMI)
7.12 Planning for repair
7.13 Cabling – Requirements
7.13.1 General
7.13.2 Unscreened cabling
7.13.3 Screened cabling
7.13.4 Optical fibre cabling
7.14 Planning and assessment of cabling in support of remote powering objectives
7.14.1 General
7.14.2 Remote powering installations of Category RP3
7.14.2.1 General
7.14.2.2 Planning of new cabling
7.14.2.3 Assessment of existing cabling
7.14.3 Connecting hardware
7.14.3.1 General
7.14.3.2 Planning of new cabling
7.14.3.3 Assessment of existing cabling
8 Installation practices
8.1 General
8.2 Safety
8.2.1 General
8.2.2 Power supply cabling
8.2.3 Telecommunications cables fire performance
8.2.4 Optical fibre cabling
8.2.5 Guards and signs
8.2.6 Enclosed spaces
8.2.7 Maintenance holes
8.2.8 Closures
8.3 Environment
8.3.1 Storage
8.3.1.1 Requirements
8.3.1.2 Recommendations
8.3.2 Installation – Requirements
8.4 Component inspection and testing – Requirements
8.5 Pathways
8.5.1 Requirements
8.5.1.1 General
8.5.1.2 Inside buildings
8.5.1.3 Outside buildings
8.5.1.3.1 Underground
8.5.1.3.2 Aerial
8.5.2 Recommendations
8.5.2.1 Outside buildings
8.5.2.1.1 Underground
8.5.2.1.2 Aerial
8.6 Spaces
8.6.1 Requirements
8.6.1.1 General
8.6.1.2 Maintenance holes and hand holes
8.6.1.3 Telecommunications cabinets outside buildings
8.6.1.4 Entrance facilities
8.6.1.5 Rooms and enclosures intended to contain distributors
8.6.1.6 Cabinets, frames and racks
8.6.1.7 Closures
8.6.1.8 Outlets
8.6.2 Recommendations
8.6.2.1 Maintenance holes and hand holes
8.6.2.2 Telecommunications cabinets outside buildings
8.7 Pathway system installation
8.7.1 General
8.7.1.1 Requirements
8.7.1.2 Recommendations
8.7.2 Inside buildings
8.7.2.1 Requirements
8.7.2.2 Recommendations
8.7.3 Outside buildings
8.7.3.1 Requirements
8.7.3.2 Recommendations
8.8 Closure installation
8.9 Cable installation
8.9.1 Cable installation within pathway systems
8.9.1.1 General
8.9.1.1.1 Requirements
8.9.1.1.2 Recommendations
8.9.2 Inside buildings
8.9.2.1 Requirements
8.9.2.2 Recommendations
8.9.3 Cable installation in maintenance holes
8.9.4 Cable installation within closures – Requirements
8.10 Jointing and terminating of cables
8.10.1 Requirements
8.10.2 Balanced cabling
8.10.3 Screened balanced cabling
8.10.4 Optical fibre cabling
8.11 Cords and jumpers
8.12 Surge protective devices
8.13 Acceptance
8.13.1 Inspection
8.13.2 Testing
9 Documentation and administration
9.1 Symbols and preparation of documents
9.1.1 Requirements
9.1.2 Recommendations
9.2 Administration
9.2.1 General
9.2.2 Administration system
9.2.2.1 General
9.2.2.2 Installation complexity
9.2.2.3 Operational complexity
9.2.2.4 Administration system
9.2.2.4.1 Requirements
9.2.2.4.2 Recommendations
9.2.3 Identifiers – Requirements
9.2.4 Component labelling
9.2.4.1 Requirements
9.2.4.2 Recommendations
9.2.4.2.1 Labelling
9.2.4.2.2 Colour coding
9.2.5 Records
9.2.5.1 General
9.2.5.2 Requirements
9.2.5.3 Recommendations
9.2.5.4 Optional
9.2.5.5 Other recommended documentation
9.2.6 Cable administration system
9.2.6.1 General
9.2.6.2 Requirements
9.2.6.3 Recommendations
9.2.7 Reports
9.2.7.1 Requirements
9.2.7.2 Recommendations
10 Testing
10.1 General
10.1.1 Links and permanent links
10.1.2 Channels
10.1.3 Cabling interface adapters
10.1.4 Calibration
10.1.5 Equipment protection
10.1.6 Measurement conditions
10.2 Test procedures for balanced cabling
10.2.1 General
10.2.2 Measurement of length-related parameters
10.2.3 Treatment of marginal test results
10.2.4 Treatment of unacceptable test results
10.2.5 Test result format
10.2.6 Test result documentation
10.2.6.1 Equipment in accordance with urn:iec:std:iec:61935-1::::IEC 61935–1
10.2.6.2 Other equipment
10.2.6.3 Results relating to remote powering performance
10.3 Test procedures for optical fibre cabling
10.3.1 General
10.3.2 Treatment of unacceptable test results
10.3.3 Test result documentation
11 Inspection
11.1 General
11.2 Inspection Level 1
11.3 Inspection Level 2
11.4 Inspection Level 3
11.5 Inspection documentation – Requirements
12 Operation
12.1 Connection of equipment
12.2 Standard operating procedure
12.2.1 Requirements
12.2.2 Recommendations
12.3 Cords and jumpers
12.4 Optical fibre adapters
13 Maintenance
13.1 Approaches to maintenance
13.1.1 General
13.1.2 Requirements
13.2 Maintenance procedures
13.2.1 Requirements
13.2.2 Recommendations
14 Repair
Annex A
A.1 General
A.2 Duplex connecting hardware interfaces
A.2.1 Duplex plugs, adapters and cords
A.2.2 Polarity of installed cabling segments
A.2.3 Symmetrical positioning method
A.2.4 Reverse-pair positioning method
A.3 Connecting hardware interfaces for arrays with 12 optical fibres per row
A.3.1 General
A.3.2 Array connecting hardware components
A.3.2.1 General
A.3.2.2 Cables and array connector patch cords
A.3.2.3 Array adapters
A.3.2.4 Transition assemblies for duplex cabling
A.3.3 Array connectivity methods
A.3.3.1 Duplex channels
A.3.3.2 Parallel optics channels
A.4 Connecting hardware interfaces for arrays with more than 12 optical fibres per row
A.4.1 General
A.4.2 Array connecting hardware components
A.4.2.1 General
A.4.2.2 Cables and array connector patch cords
A.4.2.3 Array adapters
A.4.2.4 Transition assemblies for duplex cabling
A.4.3 Array connectivity method
A.4.3.1 Duplex cabling
A.4.3.2 Array cabling
Annex B
B.1 General
B.7 Installation planning
B.7.6 Pathways and pathway systems
B.7.6.1 Common pathways and spaces bypass (diverse cable routing)
B.7.6.2 Requirements
B.7.6.2.1 Access and security
B.7.6.2.2 External network entrance pathways
B.7.6.2.3 Common pathways within the premises
B.7.6.3 Recommendations
B.7.6.3.1 Campus pathways
B.7.6.3.2 External network entrance pathways
B.7.6.3.3 Common pathways within the premises
B.7.7 Spaces
B.7.7.1 Requirements
B.7.7.1.1 Entrance room
B.7.7.1.2 Access provider and service provider spaces
B.7.7.1.3 CERs
B.7.7.1.4 CTRs
B.7.7.2 Recommendations
B.7.7.2.1 Access provider and service provider spaces
B.7.7.2.2 CERs
B.7.7.2.3 CTRs
Annex C
C.1 General
C.5 Specification of installations
C.5.2 Installation specification
C.5.2.2 Recommendations
C.5.2.2.1 Application considerations
C.5.2.2.2 External service provision
C.11 Inspection
C.11.1 Requirements
Annex D
D.1 General
D.5 Specification of installations
D.6 Quality planning
D.7 Installation planning
D.8 Installation practices
D.9 Documentation and administration
D.10 Testing
D.11 Inspection
D.13 Maintenance
D.14 Repair
Annex E
E.1 General
E.5 Specification of installations
E.5.5 Quality assurance
E.6 Quality planning
E.6.1 Quality plan
E.7 Installation planning
E.7.5 External service provision
E.7.6 Pathways and pathway systems
E.7.6.2 Inside buildings
E.7.6.2.1 Requirements
E.7.6.2.1.1 General
E.7.6.2.1.2 Home entrance to primary distribution space
E.7.6.1.2.3 Primary distribution space to secondary distribution space
E.7.6.1.2.4 Primary/secondary distribution space into the home
E.7.6.2.2 Recommendations
E.7.6.2.2.2 Primary/secondary distribution space into the home
E.7.7 Spaces
E.7.7.1 Requirements
E.7.7.1.1 Home entrance
E.7.7.1.2 Primary home distribution space
E.7.7.1.3 Secondary home distribution space
E.7.7.1.4 Junction box
E.7.7.2 Recommendations
E.7.7.2.1 Primary home distribution space
E.7.7.2.2 Secondary home distribution space
E.11 Inspection
E.11.1 Requirements
E.11.2 Recommendations
Annex F
F.1 General
F.5 Specification of installations
F.5.2 Installation specification
F.5.2.2 Recommendations
F.5.2.2.1 Application considerations
F.7 Installation planning
F.7.6 Pathways and pathway systems
F.7.6.2 Inside buildings
F.7.6.2.2 Recommendations
F.7.6.2.2.1 Pathway and pathway system capacity planning
F.7.6.2.2.2 Equipment room pathways
F.7.8 Functional elements
F.7.8.2 Recommendations
F.7.8.2.1 Cabinets, frames and racks containing, or intended to contain, active equipment
F.9 Documentation and administration
F.9.2 Recommendations
F.11 Inspection
F.11.1 Requirements
F.11.2 Recommendations
Annex G
G.7 Installation planning
G.7.6 Pathways and pathway systems
G.7.7 Spaces
G.7.7.1 Requirements
G.7.7.1.4 Rooms intended to contain SDs
G.7.8 Functional elements
G.7.8.1 Requirements
G.7.8.1.4 Cabinets, frames and racks containing SDs
G.7.8.1.5 Closures housing SCPs
G.7.8.2 Recommendations
G.7.8.2.5 Closures housing SCPs
Annex H
Annex I
I.1 General
I.2 Calculation of Tglobal
I.3 Remote powering installation of Category RP2
I.3.1 Temperature rise equations
I.3.2 Planning of new cabling
I.3.3 Assessment of existing cabling
I.4 Installation conditions
Bibliography
Cited references in this standard
urn:iec:std:iso-iec:30129::::
Information technology – Telecommunications bonding networks for buildings and other structures
urn:iec:std:iso-iec:20000-1::::
Information technology – Service management – Part 1: Service management system requirements
urn:iec:std:iso-iec:18598::::
Information technology – Automated infrastructure management (AIM) systems – Requirements, data exchange and applications
urn:iec:std:iso-iec:14763-3::::
Information technology – Implementation and operation of customer premises cabling – Part 3: Testing of optical fibre cabling
urn:iec:std:iso-iec:11801-6::::
Information technology – Generic cabling for customer premises – Part 6: Distributed building services
Content history
DR AS/NZS 14763.2:2020

One-time Purchase

Access via web browser on any device
One-time purchase
Single publication
Offline access via PDF^

$282.33 AUD

Inclusive of GST
Format *
iconCreated with Sketch.
Web Reader
Licenses *
iconCreated with Sketch.
1 user
Total$282.33 AUD
Add to Cart
IMPORTANT