AS ISO 21511:2022
[Current]Work breakdown structures for project and programme management
AS ISO 21511:2022 identically adopts ISO 21511:2018, which provides guidance for work breakdown structures for organizations undertaking project or programme management. It is applicable to any type of organization, including public or private, and any size of organization or sector, as well as any type of project or programme in terms of complexity, size, or duration.
Published: 16/12/2022
Pages: 24
Table of contents
Cited references
Content history
Table of contents
Header
About this publication
Preface
Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Work breakdown structure concepts
4.1 General
4.2 Purpose
4.3 Context
4.4 Hierarchical decomposition
4.5 Parent–child relationships
4.6 Progressive elaboration
5 Work breakdown structure characteristics, development and relationships to other structures
5.1 Characteristics of a work breakdown structure
5.2 Development
5.2.1 General
5.2.2 Creation
5.2.3 Description of the project or programme work breakdown structure elements
5.2.4 Composition of the work breakdown structure dictionary
5.2.5 Integration of multiple work breakdown structures
5.3 Work breakdown structure relationships
5.3.1 General
5.3.2 Relationship to organizational breakdown structure
5.3.3 Relationship to contracts
5.3.4 Relationship to functional areas
5.3.5 Relationship to other structures
5.4 Control of work breakdown structure
5.5 Uses and benefits of the work breakdown structure
5.5.1 Uses of the work breakdown structure
5.5.2 Benefits from the work breakdown structure
Annex A
Annex B
Annex C
Bibliography
Cited references in this standard