Standard
UPDATE AVAILABLE
AS 5100.7-2004
[Superseded]Bridge design, Part 7: Rating of existing bridges
Sets out a rating process for existing bridges, to specify their safe capacity for carrying repeated live loads for their defined remaining service life.
Published: 01/01/2004
Pages: 36
Content history
Content history
[Current]
[Superseded]
[Withdrawn]
[Withdrawn]
[Superseded]
$113.50
AUD
Inclusive of GST
Available formats
Web Reader (PDF)
Licence:
1 user
Total
$113.50