Standard
Track updates
AS 2792-1992
[Current]Fire hose — Delivery layflat
Specifies general and performance requirements for delivery layflat fire hose of two types, viz., percolating and non-percolating. Appendices deal with performance test procedures, additional requirements for fire hose, which may be specified by the purchaser, and detailed advice and recommendations on the information to be supplied by the purchaser at the time of enquiry or order.
Published: 13/07/1992
Pages: 22
Table of contents
Cited references
Content history
Table of contents
Header
About this publication
PREFACE
FOREWORD
1 SCOPE AND GENERAL
1.1 SCOPE
1.2 APPLICATION
1.3 REFERENCED AND RELATED DOCUMENTS
1.4 DEFINITIONS
1.5 CLASSIFICATION
2 GENERAL REQUIREMENTS
2.1 CONSTRUCTION
2.1.1 Percolating hose
2.1.2 Non-percolating hose
2.1.3 Jacket
2.1.4 Lining
2.1.5 Coating
2.2 INSIDE DIAMETER
2.3 NOMINAL LENGTH
2.4 MASS
2.5 MARKING
3 PERFORMANCE REQUIREMENTS
3.1 ALL HOSE
3.1.1 General
3.1.2 Proof pressure
3.1.3 Burst pressure
3.1.4 Pressure loss due to friction
3.1.5 Dimensional stability
3.1.6 Serviceability after kinking
3.1.7 Flexibility
3.2 PERCOLATING HOSE
3.3 NON-PERCOLATING HOSE
3.3.1 Abrasion resistance
3.3.2 Lining adhesion
3.3.3 Ageing
APPENDIX A
A1 GENERAL
A2 INTENDED USE—LIAISON WITH THE MANUFACTURER
A3 INFORMATION TO BE SUPPLIED BY THE PURCHASER
A4 QUANTITY AND DELIVERY INSTRUCTIONS
A5 INDEPENDENT TESTS
A6 TEST CERTIFICATE
APPENDIX B
B1 SCOPE
B2 COATING STABILITY
B3 REPAIRABILITY
B4 HEAT RESISTANCE
B5 CHEMICAL RESISTANCE
B6 FULL LENGTH KINK RESISTANCE
APPENDIX C
C1 REFERENCED DOCUMENTS
APPENDIX D
D1 SCOPE
D2 PRESSURE GAUGE
D3 TIMING DEVICE
D4 MEASURING DEVICE
APPENDIX E
E1 SCOPE
E2 PRINCIPLE
E3 TEST SAMPLE
E4 APPARATUS
E5 PROCEDURE
E6 TEST FAILURES
E7 TEST REPORT
APPENDIX F
F1 SCOPE
F2 PRINCIPLE
F3 TEST SAMPLE
F4 APPARATUS
F5 PROCEDURE
F6 TEST FAILURES
F7 TEST REPORT
APPENDIX G
G1 SCOPE
G2 PRINCIPLE
G3 TEST SAMPLE
G4 APPARATUS
G5 PROCEDURE
G6 REPORTING OF RESULTS
APPENDIX H
H1 SCOPE
H2 PRINCIPLE
H3 TEST SAMPLE
H4 APPARATUS
H5 PROCEDURE
H6 TEST REPORT
APPENDIX I
I1 SCOPE
I2 PRINCIPLE
I3 TEST SAMPLE
I4 APPARATUS
I5 PROCEDURE
I6 TEST REPORT
APPENDIX J
J1 SCOPE
J2 PRINCIPLE
J3 TEST SAMPLE
J4 APPARATUS
J5 PROCEDURE
J6 TEST REPORT
APPENDIX K
K1 SCOPE
K2 PRINCIPLE
K3 APPARATUS
K4 TEST SAMPLE
K5 PROCEDURE
K6 RESULTS
K7 TEST REPORT
APPENDIX L
L1 SCOPE
L2 PRINCIPLE
L3 APPARATUS
L4 TEST SAMPLE
L5 PROCEDURE
L6 TEST REPORT
APPENDIX M
M1 SCOPE
M2 PRINCIPLE
M3 TEST SAMPLE
M4 APPARATUS
M5 PROCEDURE
M6 TEST REPORT
APPENDIX N
N1 SCOPE
N2 PRINCIPLE
N3 TEST SAMPLE
N4 APPARATUS
N5 PROCEDURE
N6 TEST REPORT
APPENDIX O
O1 SCOPE
O2 PRINCIPLE
O3 HOSE REPAIR MATERIALS
O4 APPARATUS
O5 TEST SAMPLE
O6 PROCEDURE
O7 TEST REPORT
APPENDIX P
P1 SCOPE
P2 PRINCIPLE
P3 APPARATUS
P4 TEST SAMPLE
P5 PROCEDURE
P6 TEST REPORT
APPENDIX Q
Q1 SCOPE
Q2 PRINCIPLE
Q3 REAGENTS
Q4 APPARATUS
Q5 TEST SAMPLE
Q6 PROCEDURE
Q7 TEST REPORT
APPENDIX R
R1 SCOPE
R2 PRINCIPLE
R3 APPARATUS
R4 TEST SAMPLE
R5 PROCEDURE
R6 TEST REPORT
Cited references in this standard
[Current]
Fire hydrant installations, Part 1: System design, installation and commissioning
DEF(AUST) 5603
Foam liquid, fire extinguishing, concentrate, aqueous film forming (AFFF) specification
DEF(AUST) 5240
Turbine fuel, aviation (kerosine type plus S-748) specification NATO Code No F-34 AVTUR/FSII
DEF(AUST) 5157
Detergent, emulsion, degreasing specification
Content history
[Superseded]
[Superseded]
[Withdrawn]
[Withdrawn]
AS 2792-1992 Rec:2017
One-time Purchase
Access via web browser on any device
One-time purchase
Single publication
Offline access via PDF^
$104.71 AUD
Inclusive of GSTFormat *
Web Reader
Licenses *
1 user
Total$104.71 AUD
IMPORTANT