Standard
Track updates
AS 2157-1997
[Pending Revision]Cutback bitumen
Specifies requirements for medium-curing cutback bitumen for roadmaking purposes.
Published: 05/06/1997
Pages: 9
Table of contents
Cited references
Content history
Table of contents
Header
About this publication
PREFACE
1 SCOPE
2 REFERENCED DOCUMENTS
3 DEFINITION
4 CLASSIFICATION AND GRADING
5 PROPERTIES
6 SAMPLING
7 MARKING OF CONTAINERS
APPENDIX A
A1 GENERAL
A2 INTENDED USE—LIAISON WITH THE SUPPLIER
A3 INFORMATION TO BE SUPPLIED BY THE PURCHASER
A4 INFORMATION TO BE PROVIDED BY THE SUPPLIER
A5 TEST CERTIFICATE
A6 INSPECTION
APPENDIX B
B1 SCOPE
B2 PURPOSE
B3 SAMPLE CONTAINERS
B4 SIZE OF SAMPLES
B5 PROCEDURE
B5.1 General
B5.2 Sampling from bulk storage
B5.3 Sampling during loading
B5.4 Sampling of rail tankers and road tankers
B5.5 Sampling from sprayers
B5.6 Sampling of drums
B5.7 Sub-sampling for test portions
B6 SAMPLING PRECAUTIONS
B7 SAFETY PRECAUTIONS
B8 LABELLING
B9 SAMPLING OF BITUMEN
B10 SAMPLING OF VOLATILE DILUENT
Cited references in this standard
[Withdrawn]
Methods of testing bitumen and related roadmaking products, Method 16: Determination of flashpoint of cutback bitumen
[Current]
Methods of testing bitumen and related roadmaking products, Method 15: Distillation of cutback bitumen
[Current]
Methods of testing bitumen and related roadmaking products, Method 7: Determination of density using a density bottle
[Withdrawn]
Methods of testing bitumen and related roadmaking products, Method 6: Determination of density using a hydrometer
One-time Purchase
Access via web browser on any device
One-time purchase
Single publication
Offline access via PDF^
$59.99 AUD
Inclusive of GSTFormat *
Web Reader
Licenses *
1 user
Total$59.99 AUD
IMPORTANT