Standard
UPDATE AVAILABLE
AS 1510.1-1974
[Superseded]Code of practice for control of concrete surfaces, Part 1: Formwork
Sets out requirements for formwork, concrete mix, and placing of concrete to achieve five standards of surface finish and three standards of colour control. The inter-relationship between formwork, concrete mix, release agent and placing of plastic concrete in achieving a desired surface finish is fully covered, and appendices tabulate and illustrate physical irregularities and their causes, and colour variations and their cause s, and include examples of Types A and B colour control.
Published: 01/11/1974
Pages: 39
Content history
$161.10
AUD
Inclusive of GST
Available formats
Web Reader (PDF)
Licence:
1 user
Total
$161.10